Several changes have been made to the Waste Water Treatment Plant (WWTP) in order to improve communication between stations around Benidorm.
 This is an overhead communications network to provide coverage to all the city's pumping stations and to improve service provision. To this end, we have erected three 30-metre towers to place the antennas and have a better view of the entire operation area.
 One of them is located at the top of the mountain to have a better view of the stations, and avoid possible interruptions.
 
As a significant feature, this connection can provide wireless broadband access up to 50 Kilometers. Compared to the conventional wifi protocol, which has a range of about 100 meters, the difference between these two technologies is clear.
 We will also have response times of milliseconds so that our customer can guarantee real-time control of the city's wastewater infrastructure.
 This data can be visualised by SCADAS carried out by our development technicians. In this case, if it is necessary to make a change in any station, it can be done instantly to avoid any problem.